IET

RPG 2022 I Keynote Critical pathways for Net Zero, Paul Monks, CSA, BEIS

Skip to main content
The Institution of Engineering and Technology iet.tv
Site name
  • Videos
  • Channels
  • Events
  • Series

Access and Account

Access your personal account

Log in to see your favourites, lists and progress.

IET Login

Access via institution

Not currently connected to any institutions

Connect via

Access Code

Redeem Access Code
Log in to redeem access code

This video isn’t available to you right now

Login to check your access and watch the full session.
To redeem an access code, first log in.

Login
  1. Videos
  2. Video

Keynote Critical pathways for Net Zero

  • WhatsApp
  • Facebook
  • Email
  • LinkedIn
  • Bluesky
CPD This content can contribute towards your Continuing Professional Development (CPD) as part of the IET's CPD Monitoring scheme.
Event
  • Session
  • Friday, 23 September 2022
  • 09:00
  • Duration: 19 mins
  • Publication date: 10 Oct 2022
  • Location: Turing Lecture Theatre

Abstract

Keynote I Critical pathways for Net Zero

• Net Zero and the systems of systems challenge
• Energy system cost reduction
• Critical Minerals

Paul Monks, CSA, BEIS

The Institution of Engineering and Technology iet.tv

Address: Futures Place, Kings Way, Stevenage, SG1 2UA

Telephone: +44 (0)33 049 9123

Email:  iet.tv@theiet.org

© 2026 The Institution of Engineering and Technology.

The Institution of Engineering and Technology is registered as a Charity in England & Wales (no 211014) and Scotland (no SC038698). Futures Place, Kings Way, Stevenage, Hertfordshire, SG1 2UA, United Kingdom

  • LinkedIn
  • Instagram
  • YouTube
Privacy statement Cookie Preferences Accessibility About us theiet.org Help

Powered by Cadmore Media

Embed Code

<script type="text/javascript" src="https://play.cadmore.media/js/EMBED.js"></script> <div class="cmpl_iframe_div"> <iframe src="https://play.cadmore.media/Player/325d36eb-44c9-4522-bb93-ff3ef4b53513" scrolling="no" allowtransparency="true" allowautoplay="true" frameborder="0" allow="encrypted-media;autoplay;fullscreen" class="cmpl_iframe" allowfullscreen="" style="overflow: hidden;border: 0px; margin: 0px; height: 100%; width:100%;"></iframe> </div>

Are you sure you want to reset your password?

If so, you will be redirected to the Authentication Service