The aim of this presentation is to give an insight and understanding in to the process associated with signalling power supply and distribution design associated with the integrated trackside power supplies (ITPS) on West Coast. Topic areas to be covered are: client compliance requirement, identifying a distribution strategy, key stages of the project cycle, signalling load calculation, distribution arrangements, PSP layout and project interfaces